Match The Following
Question
Correct Answer

Repair Maintenance Course
Principles of Equipments

Safety course
Nature of Accidents

Computer training
Terminology

Staff Development courses
Hierarchy in the organisation


True/False
Question
In the drawing of machinery both views to be shown.
Correct Answer
True


Select The Blank
Question
Value analysis applies ________ approach to find out unnecessary cost.
Correct Answer
Creative


Multiple Choice Multiple Answer
Question
Development of subordinates broadly will depend on :-
Correct Answer
The level of education , The level of personal skill , The level of intelligence

Select The Blank
Question
Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer
Trigger


True/False
Question
Electrical energy is the most commonly used form of energy.
Correct Answer
True


Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults


Select The Blank
Question
There are ________ chemicals which are in common use.
Correct Answer
60000


Select The Blank
Question
In ________ phase the plant is observed for any indications of defects.
Correct Answer
Post overhaul


Multiple Choice Multiple Answer
Question
In Maintenance Control Model following things are very important :-
Correct Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule


Multiple Choice Single Answer
Question
Overtime working of operator make them less alert mentally & physically, this may cause :-
Correct Answer
Accident


Select The Blank
Question
A unit called ________ measures illumination.
Correct Answer
Lux


Maintenance Management - 4


True/False
Question
Preventive maintenance program reduces overall maintenance cost which also include spare cost.
Correct Answer
True


True/False
Question
Textile oil is nothing but automotive lubricative oil.
Correct Answer
False


True/False
Question
The time period for budget is taken as one year.
Correct Answer
True


True/False
Question
Now a days a trend is emerging of employing multi skilled executives who are trained in many disciplines.
Correct Answer
True


True/False
Question
Maintainability is defined as ease with which product can be serviced or repaired.
Correct Answer
True


Multiple Choice Single Answer
Question
Which qualities are required for Maintenance Inspector?
Correct Answer
Sound Judgement ability


Match The Following
Question
Correct Answer

Control System
Feedback of Information

Work Order Release System
Trigger to start activities

Technical Literature
Relevant Drawings

Progress of Work
Schedule Board


Multiple Choice Multiple Answer
Question
The subjective evaluation method characteristics are :-
Correct Answer
Attitude to change , Moral of maintenance staff , Safety consciousness


Select The Blank
Question
Adequate ________ should be provided in the design of the equipment to prevent any mishap.
Correct Answer
Interlocks, safety alarms


Select The Blank
Question
________ is extensively used in testing pressure vessels & steam pipes.
Correct Answer
Leakage Testing


Multiple Choice Single Answer
Question
How a molecule of fuel fragmented?
Correct Answer
H+ and OH-


Multiple Choice Single Answer
Question
Normally Ratio of Unplanned work to planned work is given in :-
Correct Answer
Maintenance Report & Analysis


True/False
Question
The steam trap plays a vital role in the performance of the machine.
Correct Answer
True


Multiple Choice Single Answer
Question
Proper spare part will enhance the life of equipment and will save vital :-
Correct Answer
Capital expenditure


Multiple Choice Multiple Answer
Question
Spare part can be categorized by :-
Correct Answer
The speed of use , Its value , Its availability


Multiple Choice Multiple Answer
Question
Which are the ways to release work orders?
Correct Answer
Supervisors himself issues it , To display on work order board , To put it in allotted flaps of workers


Match The Following
Question
Correct Answer

Scheduling
Necessary

Down time control
Zero

Inventory level
Low

Preventative maintenance
As per Plan


Select The Blank
Question
Maintenance department falls under ________ department.
Correct Answer
Service

Select The Blank
Question
Lubrication of machines is done________.
Correct Answer
As per schedule


Multiple Choice Single Answer
Question
Before starting evaluation of maintenance function, it is better to start with :-
Correct Answer
SWOT analysis of maintenance function


Multiple Choice Single Answer
Question
The maintenance analysis gives total down time and its percentage with respect to :-
Correct Answer
Total available period


Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults


Multiple Choice Single Answer
Question
The modern management is composed of evaluation, refinement and integration of functional objectives into an :-
Correct Answer
Integrated corporate goal


Multiple Choice Multiple Answer
Question
The objective inventory control is :-
Correct Answer
To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material

Multiple Choice Multiple Answer
Question
The three major cost associated with inventories are :-
Correct Answer
Inventory carrying cost , Ordering cost , Stock out cost


Multiple Choice Multiple Answer
Question
The price structure of purchased equipment generally consist of :-
Correct Answer
The basic price of the machine , The nature of taxes and duties , The price of essential spares for sufficient stock, transport, Insurance etc.


Select The Blank
Question
In Japan & Western countries equipment discarded after about ________ years.
Correct Answer
7


Select The Blank
Question
Moving objects wear out giving rise to ________.
Correct Answer
Debris


Multiple Choice Single Answer
Question
Which of the following is process variable which can affect the equipment?
Correct Answer
Flow rate of process fluid


True/False
Question
Value analysis is one way to attempt for quality simplification.
Correct Answer
True


Select The Blank
Question
a ________ is the cost of money invested in stocks is usually borrowed from banks as working capital.
Correct Answer
Financing cost


True/False
Question
Defect analysis gives us information about commonly faced problems.
Correct Answer
True


Select The Blank
Question
The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room.
Correct Answer
Schedule Board


Multiple Choice Multiple Answer
Question
What are the essentials of well planned lubrication system?
Correct Answer
Frequency of lubrication , Quality of lubricant , Quantity of lubricant


True/False
Question
Technology review is done to check the performance efficiency of plant.
Correct Answer
True


Select The Blank
Question
The manufacturing time for spare parts can vary from________.
Correct Answer
Zero to one year

Multiple Choice Single Answer
Question
Freight & packing/forwarding brought down to 1% from 5% is example of :-
Correct Answer
Cost reduction


Multiple Choice Multiple Answer
Question
The following costs can be treated under the heads of Wages and salaries :-
Correct Answer
The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges.


True/False
Question
Too may cooks spoil the broth.
Correct Answer
True


Multiple Choice Multiple Answer
Question
Some of the elements of the ordering cost are :-
Correct Answer
Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors.


Multiple Choice Single Answer
Question
Which two departments are closely related to each other?
Correct Answer
Production & maintenance


Select The Blank
Question
________ is the period that elapses between the recognition of the need of spare parts and its fulfillment.
Correct Answer
Lead time

Multiple Choice Single Answer
Question
The responsibility of maintenance Department is to ensure cost at :-
Correct Answer
Minimum


Multiple Choice Multiple Answer
Question
Master list of all the supplier should consist of information such as :-
Correct Answer
Name, address, telephone, fax nos , Financial status , His rating for the year.


Multiple Choice Multiple Answer
Question
What should be contents of Computer training?
Correct Answer
Computer Terminology , It's use in Maintenance , How to handle it


Multiple Choice Single Answer
Question
What can be minimized by detecting an incipient fault?
Correct Answer
Damage


Multiple Choice Multiple Answer
Question
Some of the elements of inventory carrying cost are :-
Correct Answer
Storage expenses , Insurance charges , Cost of deterioration

Maintenance Management - 3


Match The Following
Question
Correct Answer

Repair Maintenance Course
Principles of Equipments

Safety course
Nature of Accidents

Computer training
Terminology

Staff Development courses
Hierarchy in the organisation


True/False
Question
In the drawing of machinery both views to be shown.
Correct Answer
True


True/False
Question
Efficiency of any machine not exceed 50%.
Correct Answer
False


Multiple Choice Single Answer
Question
It is objective of maintenance to make maximum availability of production plant at :-
Correct Answer
Minimum cost


Select The Blank
Question
If the job performed on the purchased equipment is OK in terms of quality & quantity, which was conceived at the beginning is known as ________.
Correct Answer
Proving
True/False
Question
Technology review is done to check the performance efficiency of plant.
Correct Answer
True


True/False
Question
The value analysis takes into account the used value and esteem value.
Correct Answer
True


True/False
Question
The supervisor must have good knowledge of his job, he should be able to lead by example.
Correct Answer
True


Multiple Choice Single Answer
Question
Cracks developed in machine parts is :-
Correct Answer
Mechanical Variable


Multiple Choice Single Answer
Question
Which is considered as main job of a supervisor?
Correct Answer
To train subordinate


Multiple Choice Multiple Answer
Question
From the following identify the spares :-
Correct Answer
Fuse , Relay , Nut & bolts


Match The Following
Question
Correct Answer

Objective of control of spare part
Control over the consumption of spare

Reconditioning of the spare part
Recycling of lubrication oil reusing waste water

Standardization
Bearing, V belts, flat belts

Codification of spare part
Equipment code number to which it belongs


Select The Blank
Question
In the industry major hazards which can occur is ________.
Correct Answer
Explosions


Select The Blank
Question
________ & maintenance department are closely interlinked to each other.
Correct Answer
Production


Multiple Choice Multiple Answer
Question
The performance of maintenance is indicated by :-
Correct Answer
Low cost , Low down time , More uptime

Multiple Choice Single Answer
Question
The responsibility of maintenance Department is to ensure cost at :-
Correct Answer
Minimum


True/False
Question
Technical manual is not a product support document.
Correct Answer
False


True/False
Question
On line inspection is carried out on machine itself but when it is shut down.
Correct Answer
False


Multiple Choice Multiple Answer
Question
Which of the following are metal working oils?
Correct Answer
Soluble cutting oil , Synthetic cutting oil , Srip grinding oil


Multiple Choice Multiple Answer
Question
The following costs can be treated under the heads of Wages and salaries :-
Correct Answer
The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges.


Multiple Choice Single Answer
Question
What is more important while using components like nut bolts, screws?
Correct Answer
Standardization


Multiple Choice Single Answer
Question
Name the book in which complete inventory of the buildings and plant is maintained?
Correct Answer
Assets Register


Multiple Choice Single Answer
Question
The wear-in period which occurs during initial working period, experiences lot of maintenance problems is also called :-
Correct Answer
Teething problems


Multiple Choice Single Answer
Question
Negotiation of the price also includes :-
Correct Answer
Variation of the price


Select The Blank
Question
Value analysis applies ________ approach to find out unnecessary cost.
Correct Answer
Creative


Multiple Choice Multiple Answer
Question
Development of subordinates broadly will depend on :-
Correct Answer
The level of education , The level of personal skill , The level of intelligence


Select The Blank
Question
Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer
Trigger


True/False
Question
Electrical energy is the most commonly used form of energy.
Correct Answer
True


Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults


Select The Blank
Question
There are ________ chemicals which are in common use.
Correct Answer
60000


Select The Blank
Question
In ________ phase the plant is observed for any indications of defects.
Correct Answer
Post overhaul


Multiple Choice Multiple Answer
Question
In Maintenance Control Model following things are very important :-
Correct Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule


Multiple Choice Single Answer
Question
Overtime working of operator make them less alert mentally & physically, this may cause :-
Correct Answer
Accident


Select The Blank
Question
A unit called ________ measures illumination.
Correct Answer
Lux


Multiple Choice Single Answer
Question
Team spirit, policy on line of authority help in bringing people together & work in one direction to :-
Correct Answer
Achieve goal


Select The Blank
Question
A ________ represents basic event which needs no further investigation as sufficient information is available under fault free analysis.
Correct Answer
Circle


Multiple Choice Single Answer
Question
It has been found that after initial period of steam pipe laying is over :-
Correct Answer
The pipeline and various fittings like valve, taps starts leaking.


Multiple Choice Multiple Answer
Question
The criticality of equipment may change with :-
Correct Answer
Time , Technology


Multiple Choice Multiple Answer
Question
Training helps in :-
Correct Answer
Knowledge of plant , Multiskilled purpose , Reduced cost


Multiple Choice Multiple Answer
Question
Which are the major hazards which can occur in Industry?
Correct Answer
Toxicity , Radioactivity , Poisons


Multiple Choice Single Answer
Question
Identify the insurance spares from the following :-
Correct Answer
Hydraulic pump of press machine


Multiple Choice Single Answer
Question
It is said that a failure never occurs without :-
Correct Answer
Warnings


True/False
Question
The operating cost of the equipment is also important factor for the decision making.
Correct Answer
True


Select The Blank
Question
________ should be allowed in case of real emergency.
Correct Answer
Contingency purchasing


Multiple Choice Multiple Answer
Question
Which type of lubricating oil & greases is available in market?
Correct Answer
Automotive lubricating oil , Railroad oils , Industrial lubricating oil


Multiple Choice Multiple Answer
Question
In condition based maintenance which equipments are used?
Correct Answer
Flexiscope , Radiography , Thermal Tester


True/False
Question
Too may cooks spoil the broth.
Correct Answer
True




1. Use of electrical motors

1. Must be close to unity
2. Power factor

2. Minimize of core losses
3. Transformer maintenance

3. Should get maximum attention
4. On load tap changer

4. Should be above unity


5. Reduces input voltage fluctuation


6. Is not an important factor
Maintenance Management - 2


True/False
Question
Value analysis is one way to attempt for quality simplification.
Correct Answer
True


True/False
Question
The lead time to take the decision is same in private sector companies and government controlled organizations.
Correct Answer
False


Multiple Choice Single Answer
Question
Installation & commissioning of a new plant is :-
Correct Answer
Single contract tasks


Multiple Choice Single Answer
Question
Who has to prepare training manuals?
Correct Answer
Maintenance Manager


Multiple Choice Multiple Answer
Question
The price of the spare part depends on :-
Correct Answer
Demand and supply position , Urgency of buyer , Level of negotiations


True/False
Question
Any equipment can be dismantled easily without the help of special tools.
Correct Answer
False


Match The Following
Question
Correct Answer

Time taken
As low as possible

Automation
Decrease break down time

Utilization of machine
As high as possible

Equipment selection
Purchase dept


True/False
Question
The hazardous chemicals are divided into 90 groups in decreasing order of hazard.
Correct Answer
False


Multiple Choice Multiple Answer
Question
The objective inventory control is :-
Correct Answer
To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material


True/False
Question
Proper communication with related departments can result in increased cost of spare.
Correct Answer
False


Multiple Choice Single Answer
Question
The leakage should be monitored by device known as :-
Correct Answer
Leakage detector

Select The Blank
Question
It is right of an inspector to get help of ________ at any time.
Correct Answer
Higher Authorities

Multiple Choice Single Answer
Question
What is the lower limit of the ratio of emergency maintenance to total maintenance time?
Correct Answer
Less then 25 %


Multiple Choice Multiple Answer
Question
High quality of workmanship helps maintenance people :-
Correct Answer
For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers


Multiple Choice Single Answer
Question
Proper spare part will enhance the life of equipment and will save vital :-
Correct Answer
Capital expenditure


Multiple Choice Multiple Answer
Question
With "vendor supplies equipments" what Vendor is suppose to supply?
Correct Answer
Drawings of equipments , Drawings of electrical connection , Views of equipment


Select The Blank
Question
Availability of ________ equipment is considered while deciding maintenance system.
Correct Answer
Stand by


Multiple Choice Multiple Answer
Question
Which of the following are diagnostics instrument which are used in maintenance management?
Correct Answer
Time Tester , Safety checker for portable electrical tools , Temperature Sensitive Crayons


True/False
Question
Computers can be used to predict failures and breakdowns by simulation method well in advance.
Correct Answer
True


Multiple Choice Multiple Answer
Question
Maintenance Control system is used to check following?
Correct Answer
Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback


Multiple Choice Multiple Answer
Question
Following equipment must be tested for correct load bearing capacity :-
Correct Answer
Scaffolding , Ladder , Platform


Multiple Choice Single Answer
Question
The modern management is composed of evaluation, refinement and integration of functional objectives into an :-
Correct Answer
Integrated corporate goal


Multiple Choice Single Answer
Question
To ensure high efficiency & Productivity in the maintenance work, the most important thing is :-
Correct Answer
Complete Technical Control

Multiple Choice Multiple Answer
Question
The 5 S' are related to :-
Correct Answer
Orderliness , Tideness , Purity


Multiple Choice Single Answer
Question
If equipment creates noise above permissible level then :-
Correct Answer
It may produce vibration which may affect other equipment.


Multiple Choice Single Answer
Question
What is a necessary thing, if management expects workers must do maintenance effectively?
Correct Answer
Training

Multiple Choice Multiple Answer
Question
Where CPM can be used?
Correct Answer
In Construction Business , In Research & Development Projects , Launching new products in Marketing


True/False
Question
The schedule of lubrication of equipment is not a part of maintenance plan.
Correct Answer
False


Multiple Choice Single Answer
Question
When the running machine is making sound what is to be done?
Correct Answer
Locate the noise



True/False
Question
Chart when prepared uses ' half split' method of fault diagnosis.
Correct Answer
True


Multiple Choice Multiple Answer
Question
Water as a fire extinguisher can be applied which is in the form of :-
Correct Answer
Solid stream , Fine spray , Foam


Multiple Choice Single Answer
Question
Automation of machines is mainly done for :-
Correct Answer
Detecting the failures and save time


Select The Blank
Question
________ is the period that elapses between the recognition of the need of spare parts and its fulfillment.
Correct Answer
Lead time


Select The Blank
Question
________ are used to monitor the conditions of parts subject to strains due to vibrations in operating conditions.
Correct Answer
Strain Gages


Multiple Choice Multiple Answer
Question
What is VEN in VEIN analysis?
Correct Answer
Time , Technology
Select The Blank
Question
One of the main jobs of ________ is to train the subordinates.
Correct Answer
Supervisor


Match The Following
Question
Correct Answer

Factory building
Cross ventilation

Foreign origin equipment
Manual translation into English

Non standard spare parts
Maximum lead time

Steam piping
Proper Insulation


Select The Blank
Question
Quality should not be ________ at the cost of lower price.
Correct Answer
Sacrificed


Multiple Choice Multiple Answer
Question
What may be the result of too many levels of authority?
Correct Answer
Overlapping of duties , Confusion , No work done


True/False
Question
Some equipments are patented so manufacturing of spares is possible.
Correct Answer
False


True/False
Question
Oil pump is lubricating equipment.
Correct Answer
True


Select The Blank
Question
Adequate ________ should be provided in the design of the equipment to prevent any mishap.
Correct Answer
Interlocks, safety alarms


Select The Blank
Question
To achieve high reliability we should select ________.
Correct Answer
Trouble free operation machine


Select The Blank
Question
________ is schedule of overhaul & schedule of calibrating the equipment.
Correct Answer
Maintenance schedule


Select The Blank
Question
The wear out portion has ________ failure rates.
Correct Answer
Highest


Select The Blank
Question
The spark can be generated due to ________ faults.
Correct Answer
Phase to phase

Multiple Choice Single Answer
Question
What is necessary under good house keeping to avoid sparks & ignition?
Correct Answer
Well designed equipments


Maintenance Management - 1
Question Which of the following of the main qualities of lubricant?
Answer Viscosity , Antiwear property , Alkalinity


Select The Blank
Question
________ & maintenance department are closely interlinked to each other.
Correct Answer
Production


Select The Blank
Question
Quality should not be ________ at the cost of lower price.
Correct Answer
Sacrificed


Multiple Choice Multiple Answer
Question
In the objective evaluation method, the performance indicators are :-
Correct Answer
Spare part ratio , Overtime ratio , Availability of plant ratio


True/False
Question
Shelves, Closets such fittings are consider as costing centers for buildings in the assets register.
Correct Answer
True


Multiple Choice Single Answer
Question
There could be leakage of air from system due to wrong setting of :-
Correct Answer
Safety valve


Multiple Choice Single Answer
Question
The planned maintenance is carried out :-
Correct Answer
As per manufacturers recommendations


Select The Blank
Question
Time required to diagnose is about ________ percent to total down time.
Correct Answer
40-80


Select The Blank
Question
________ should be planned so that workers can approach the equipment easily.
Correct Answer
Gangways


Multiple Choice Single Answer
Question
Which activity is known as great helper for in avoiding unscheduled breakdowns?
Correct Answer
Inspection activity


Multiple Choice Multiple Answer
Question
Cost control can be achieved by :-
Correct Answer
Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action


True/False
Question
Spare parts are also stored to cater to emergency events like strike of transporters, strike at the supplier workshop, flood, Heavy rain etc.
Correct Answer
True


True/False
Question
Chart when prepared uses ' half split' method of fault diagnosis.
Correct Answer
True


Multiple Choice Multiple Answer
Question
Which are probable period of annual shut Downs in the Year?
Correct Answer
Demand for a product is Low , Festival Seasons , Supply of Raw material is nil.


Select The Blank
Question
Maintenance department's ________ shows low performance.
Correct Answer
High cost


Multiple Choice Multiple Answer
Question
Fire can be extinguished by?
Correct Answer
Taking away heat , Stopping oxygen , Chemical extinguishing


Multiple Choice Single Answer
Question
As the frequency of maintenance is stepped up preventive maintenance cost :-
Correct Answer
Shoots up


True/False
Question
It is said that budgetary process is more a test of implementation skill then anything else.
Correct Answer
False


Multiple Choice Multiple Answer
Question
Maintenance Control system is used to check following?
Correct Answer
Maintenance planning , To get correct feedback , Correct starting time of Maintenance activities


True/False
Question
Some equipments are patented so manufacturing of spares is possible.
Correct Answer
False


Multiple Choice Multiple Answer
Question
Where CPM can be used?
Correct Answer
In Construction Business , In Research & Development Projects , Launching new products in Marketing


Multiple Choice Single Answer
Question
Which factor affects the safety of plant & people working in & around it?
Correct Answer
Accident


Multiple Choice Single Answer
Question
What is the requirement of effective & timely maintenance?
Correct Answer
Organizational Support


Multiple Choice Multiple Answer
Question
First aid can be given in following accidents :-
Correct Answer
Steam burns , Chemical spilling


Multiple Choice Multiple Answer
Question
High quality of workmanship helps maintenance people :-
Correct Answer
For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers


Multiple Choice Single Answer
Question
Negotiation of the price also includes :-
Correct Answer
Variation of the price


Multiple Choice Multiple Answer
Question
Following equipment must be tested for correct load bearing capacity :-
Correct Answer
Scaffolding , Ladder , Platform


Multiple Choice Single Answer
Question
Generally insurance spare parts are purchased :-
Correct Answer
Along with original equipment

Multiple Choice Single Answer
Question
In any organization generally called thankless department is :-
Correct Answer
Maintenance


Multiple Choice Multiple Answer
Question
Which of the following are diagnostic instruments normally used in maintenance engineering?
Correct Answer
Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter


True/False
Question
Use of fine water spray is very wrong way of fire extinguishing.
Correct Answer
False


Select The Blank
Question
In the Start up of plant phase, plant is subjected to ________ where water being used in place of process fluid.
Correct Answer
Water trial


Multiple Choice Single Answer
Question
How steam act as cooling agent to extinguishing fire?
Correct Answer
Absorbs heat from fire


Select The Blank
Question
The efforts are made to reduce time/effort required in carrying out maintenance work is ________.
Correct Answer
Design-in-maintenance


Select The Blank
Question
Reliability can be expressed as probability between________.
Correct Answer
0 to 1


Select The Blank
Question
It is estimated that during first year the maintenance cost may approximately about ________ more than the normal cost during subsequent years.
Correct Answer
0.2


True/False
Question
Calibration is an important function of maintenance manager.
Correct Answer
True


Select The Blank
Question
The ________ is done to check performance efficiency of a plant.
Correct Answer
Technological Review


True/False
Question
The operating cost of the equipment is also important factor for the decision making.
Correct Answer
True


Match The Following
Question
Correct Answer

Maintenance schedule
Schedule of over

Technical data
Drawings

Technical specification
Technical description

Handling Instruction
Transportation


Match The Following
Question
Correct Answer

Factory building
Cross ventilation

Foreign origin equipment
Manual translation into English

Non standard spare parts
Maximum lead time

Steam piping
Proper Insulation


True/False
Question
The budgetary control is planned to assist the management in the allocation of responsibility and authority to aid in making estimates and plans for the future.
Correct Answer
True


Multiple Choice Single Answer
Question
To avoid accidents & to have proper staff training, supplier must ensure that :-
Correct Answer
Complete technical help is supplied in writing to the plant engineers.


Multiple Choice Multiple Answer
Question
Which of the following are metal working oils?
Correct Answer
Soluble cutting oil , Synthetic cutting oil , Srip grinding oil


Select The Blank
Question
All ________ requirements by various government authorities must be followed.
Correct Answer
Recommended


True/False
Question
Computers can be used to predict failures and breakdowns by simulation method well in advance.
Correct Answer
True


Multiple Choice Single Answer
Question
As maintenance involves Time & Money, recordings of it is important. These records are known as :-
Correct Answer
Maintenance Record